Dammam Port 65MW Power Plant


Location : King Abdul Aziz Dammam Port

Plant Capacity

65MW – Gas Turbine Power Plant

 

Scope of work:

Engineering, Construction, Supply, Installation, Testing and Commissioning.

 

Site Progress- Ongoing Project -2019

«
  • ELECTRICAL PROJECTS

  • Medium and Low Voltage Power Projects

POWER GENERATION AIRPORT PROJECTS

Air Port Power Projects

 

Baggage Handling System and Airport Counters


Supply and Installation of Baggage Handling System & Airport Counters

Baggage and materials handling system at Domestic and Regional Airport, GAGA.

In Addition, TD will operate and maintain the recently extended baggage handling system.

The offering includes end to end baggage handling system operation, all aspects of trouble shooting, a continuous improvement process.

 

 

AIRPORT COUNTERS

 

  1. Boarding Gate Counters
  2. Check in Counters
  3. Check in Counters for Handicap
  4. Customs Counters
  5. Passport Office counters

Site Progress- Ongoing Project -2019

 

 

Our Clients :-

Hafar Al Batin in Airport, Qaisumah

King Abdullah Airport in Jizan

Al Jawf Airport

Turaif Airport

Al Ahsa Airport

 

 

 

PROJECT EXECUTION :-

Duration of Projects: 708 days 

It offers you greater efficiencies, reduced costs and happier passengers.

  • ELECTRICAL PROJECTS

  • Medium and Low Voltage Power Projects

POWER GENERATION AIRPORT PROJECTS

Air Port Power Projects

Arar – Project


Client: ARAR AIRPORT

ARAR AIR PORT Project– Construction,  supply, installation, testing, and commissioning.

Location : Arar

Scope of work:

Architectural Design,  Structure Design,  Mechanical, Electrical, Plumbing, Fire Protection, Civil Works ( Roads, Fences, Water networks, Drainage networks, Irrigation networks, Surface Drainage networks), Vertical Transportation and moving side walks.

Duration of Projects: 

Site Progress- Ongoing Project -2019

  • ELECTRICAL PROJECTS

  • Medium and Low Voltage Power Projects

POWER GENERATION AIRPORT PROJECTS

Air Port Power Projects

 

Riyadh Metro Project, Line-4, – Electromechanical works (New Project 2019)


Client: Saudi Railway Organization (KSA)

We got Riyadh Metro project– Elevated Station MEP work for Line 4 – 2017. Our work is to supply, installation, testing, and commissioning of Mechanical and Electrical systems.

Metro Line: Line 4

Type of work: Mechanical and Electrical

Duration of Projects: 21 Months

Engineering Deliverables:  HVAC, Plumbing, Electrical and Fire Fighting

Site Progress- Ongoing Project -2019

 

Read the latest car news and check out newest photos, articles, and more from the Car and Driver Blog.

  • ELECTRICAL PROJECTS

  • Medium and Low Voltage Power Projects

POWER GENERATION AIRPORT PROJECTS

Air Port Power Projects

Madinah Haj City – New Project


Madina Haj city is new project of TD. This project comprising 100 residential towers with four-star to five-star hotels, will accommodate more than 120,000 people. We are going to start work
in Madina Haj city (Building E-2).

Project Details

Work type: Civil work

Number of towers: 1 Tower

Area: 75,000 Square meter

Floor: 17 Floor

 

Read the latest car news and check out newest photos, articles, and more from the Car and Driver Blog.

We are ISO 9001:2015 Certified!


TD ISO certified

We are extremely proud to announce that we have achieved ISO 9001:2015 certification from TNV, the United Kingdom for our Electro Mechanical Works.

It’s a great achievement that shows we are truly invested in understanding our client’s needs and working with them to deliver high-quality solutions, whilst continuously reviewing and improving the way we work.

WHAT SERVICES DOES OUR EMW COVER?

The Power Generation, MEP Works, EPC, Facility Management and Technical Services.

WHAT DOES THIS MEAN FOR OUR CLIENTS?

It means they can be assured that we are working in a proven and consistent approach where client satisfaction is at the heart of what we do.

Also, it recognizes that no two projects are ever the same, so we don’t operate a ‘one size fits all’ approach to our work. Instead, we look at the best approach to take on each project to achieve the best outcome, working in a collaborative way to make sure that everyone understands, and are happy with the progress, at every stage of the project.

Not only that, but also that we regularly ask for feedback to understand where we can continue to improve how we work and ensure we keep doing the things that work well!

NOW THAT WE’RE CERTIFIED, WHAT’S NEXT?

The rigorous TNV audit and resulting certification is only one step in our commitment to excellent service delivery and TNV will be conducting surveillance visits to ensure that we continue to work to the required standard.

 

Read the latest car news and check out newest photos, articles, and more from the Car and Driver Blog.

Work start at our new project ARAR airport


We got new project ARAR airport. this is one of our big project we started working  after Dammam Port.

SCOPE OF WORK

Civil Works (roads, fences, water  network, drainage network, irrigation ,network, surface drainage network

Architectural Design

Structure Design

Mechanical/ Electrical / Plumbing / Fire Protection

Vertical Transportation and Moving Sidewalks

main-m

Hail Air Port Project going to be complete


One of our very good project in Hail is going to complete. It’s very exciting moment for us. At the same time we are going to start our new Abha air port project. 

In Hail project we did electro-mechanical work including multiple genset installation, Whole power maintenance of Port electricity system.