Dammam Port 1:

Dammam Port Project was industrialized with the capability to output 50MW Power Generation as a standby. The structures of the essential package is grounded on Simple Cycle Gas Turbine and a matching electric generator that are typically used to maintenance the grid by providing quick start (10 minutes to full power). This Project was distributed into two phases of work, as a Standby Generation and Connection with SEC Network.

Dammam Port 2:

(a). Start date: July/2019

(b). Scope of work: Connection of 50MW ( 115KV ) Gas Turbine to Saudi Electricity Network (115KV) through supply, install &test HV Cables (400mm2) , protection panels, communication panel, SAS modification & AMI system.